Official public filing
43-19 170 STREET
New York City · Queens
- Filing ID
- Q01476838-I1
- Filing status
- Plan Examiner Review
- Filing date
- Oct 20, 2026
- Type of work
- Alteration
- Description
- REPLACE THE EXISTING CONCRETE PAVING IN THE DRIVEWAY, SIDE YARD, AND SIDEWALK; REPAIR THE EXISTING PLANTER RETAINING WALLS; AND REPLACE THE PAVING STONE IN THE FRONT AND REAR YARDS. REFER TO THE DRAWINGS FOR DETAILS. NO CHANGE TO USE, EGRESS, OR C/O.
- Contractor
- Not published
- Estimated cost
- $40,000.00
Published by NYC Department of Buildings. A public filing does not guarantee an available contract.
View official source