Official public filing
401 SOUTH END AVENUE
New York City · Manhattan
- Filing ID
- M01271983-P3
- Filing status
- Plan Examiner Review
- Filing date
- Nov 6, 2026
- Type of work
- Alteration
- Description
- EWP4 - (3) 6" HDPE temp waterlines in Reach 2, (2) at Stuyvesant HS, (1) at Tribecca Pointe. Mounted w/ pipe hangers as shown in the details. Insulated & heat-traced to prevent freezing. Tie-in to existing 12" watermain & existing pipe at building entry.
- Contractor
- Not published
- Estimated cost
- $100,000.00
Published by NYC Department of Buildings. A public filing does not guarantee an available contract.
View official source